One truck-day
from your factory.
Injection moulding since 1983 — toolmaking, series production and delivery from one source.
From STEP file to series deliveries.
- Send STEPCAD file, NDA on request
- DFM reviewengineer checks feasibility
- Quotein 72 h, with DFM notes
- SamplesT1 + corrections
- Seriesproduction 24/5
- JIT deliveryown fleet, DACH 1–2 days
The numbers a buyer checks.
From STEP file to delivery.
Conventional, 2K and gas-assisted molding — with in-house toolmaking, assembly and our own fleet across the EU.
Molding 22–600 t
33 presses, parts from a few grams to large enclosures. Series and weekend production.
See all 33 machines → 022K & gas-assisted
Two-component (2K) and gas-assisted molding (GID) — fewer weld lines, lighter and stiffer parts.
Ask about technologies → 03Toolmaking
We build and service molds in-house. 400+ active molds, mold transfer from Asia with no downtime.
Ask about molds → 04Assembly
Welding, screwing, packing for your line — you receive components ready to install.
Ask about assembly → 05Own-fleet logistics
From Silesia to any plant in DACH and Benelux in 1–2 days. Consignment stock, JIT, EDI.
Ask about delivery → 06Free quotation
Send a STEP/IGES file — engineer's first response in 24 h, full quote with DFM analysis in 72 h.
Upload CAD →Buyers buy the part. Here are ours.








Your plan B for Asia that becomes plan A.
We move molds and production into the EU without stopping your supply.
Own fleet from Silesia to any plant in DACH and Benelux.
Documentation and molds stay in the EU. NDA before we open files.
Predictable landed cost and a shorter carbon footprint for CSRD.
They already produce with us.
A selection of the companies we mould parts for.





Why DACH buyers produce with us.
Built to be audited.
ISO 9001:2015, first articles ISIR/PPAP, metrology, REACH/RoHS — and an honest statement on IATF.
Real hall, real machines.








Have a project? Let's quote it.
Engineer's first response in 24 h. Full quote with DFM analysis in 72 h. NDA before we open files.



