Home / Services
Services

From the STEP file to delivery.

Four technologies, one roof: moulding, 2K, GID and an in-house tool shop with DFM.

Technologies

Four technologies in-house.

Conventional moulding

Runs from prototype to mass production — technical and consumer parts.

  • Clamping force22–600 t
  • Controlparameters of every batch

Two-shot moulding (2K)

Two plastics in one cycle: hard body + soft grip, seal in the housing — no secondary assembly.

  • Typical pairsPP/TPE, PC/ABS+TPU
  • Useelectronics, tools, automotive

Gas-assisted moulding (GID)

Parts that look solid, light inside — no sink marks, shorter cycle, less material.

  • Effect−mass, −sink marks, −cycle time
  • Usehandles, frames, thick-walled parts

Tooling, DFM & assembly

Our own design office runs the DFM analysis before we cut steel. After moulding: sub-assembly and packing for your line.

  • Mould2–8 months by complexity
  • Transferred mouldsreview + trial batch
Machine park

33 machines. 22–600 tonnes.

Tonnage classes covering over 90% of typical technical parts.

Tonnage classTypical partsTechnologies
22–90 tsmall technical parts, connectorsconventional
100–250 tcontroller housings, appliance partsconventional · 2K
280–400 tpower electronics, child seats, packagingconventional · 2K · GID
450–600 tlarge housings, pram gondolas, campervansconventional · GID
PPPEABSPCPC/ABSPA6 / PA66 (+GF)POMPBTTPE / TPU
All 33 machines with data →
Process

From STEP to delivery — eight steps.

  1. STEPsend file
  2. DFMengineer review
  3. Quotein 72 h
  4. Mouldin-house tooling
  5. SamplesT1 + tweaks
  6. PPAPfirst articles
  7. Series24/5
  8. Deliveryown fleet
Logistics

Silesia. The middle of industrial Europe.

Own fleet: parts go straight from our hall to your line. Consignment stock and JIT per framework agreement.

  • Prague~5 htruck
  • Vienna~5 htruck
  • Berlin~6 htruck
  • Munich~9 htruck
  • Frankfurt~10 htruck
  • Amsterdam~14 htruck

Does your part fit our machines?

Send a STEP file — reply in 24 h.